The Capena swimming pool construction method results in a fully reinforced concrete structure. Here at sea blue we are convinced that for complete peace of mind, the walls, base and steps need to be one reinforced concrete structure.

The walls have 4 or 6 horizontal layers for steel connected to vertical steels every 50cm. The base steel mesh is connected the wall and step steels. The concrete is then poured and for a super smooth finish the base is polished.

Learn More

Quick simple

construction

The pool structure is quick to assemble and requires the minimum of excavation around the finished pool. Typically from start of the excavation to finishing the concrete phase is 5 days.

Provided the site has reasonable access, not including landscaping beyond coping stones, your pool could be operational after 20-23 days work on site over a period of 4 weeks. (building of plant rooms, pool houses or paving/landscaping will add to this)

Learn More

Construction

Process

The Swimming Pool Construction Slide Show and Video Below

friends

links

After Sales

Service

At sea blue we ensure your pool has all the after sales support you need. We ensure your pool is fully supported in the crucial period after the build and beyond. We either provide a long term service if you require this, provide free phone support or work with your pool service organization.